Pool House On The River

Here you see the project carpenters setting the steel on the 2nd floor with the lift.
This steel will help support the true glass corner windows that weigh a ton!

Here we are again using the project lift to hoist up all of the roof sheathing.
This roof took a massive amount of sheets to cover the entire thing.

The pool crew is working hard to put up the sides of this soon to
be amazing 60 feet long salt water pool.

There will be a large deck all around the pool that will even have it’s own pergola!

The roof is finally complete with shingles and looking amazing.
The true glass corner windows have arrived from Kolbe and were installed.