Mediterranean On The Potomac

As we move the the project into drywall, we perform a series of
frame checks to insure quality in the rough framing.

DSCN0299

The stairs were custom made for the project and have now been set.

DSCN0302

Here in the basement we have prepped the swimming pool that will be in the basement and installed various pieces of equipment. Moisture is our biggest concern in a project such as this and the way we manage it is very important

DSCN0313

Leave a Reply

Your email address will not be published. Required fields are marked *