This lot did not require a lot of clearing, however it did have a lot of stormwater management requirements to properly drain. Here you can see the placement of
a huge concrete pipe that will be buried by the swell we are required to
build that will let water pass thru underground.
Here you can see that we are forming the footings to be filled with concrete.
This is a tenacious job where every measurement counts.