Here is a picture of the massive amount of steel wall panels that we had to fill
up with concrete to create the foundation of the home.
This picture shows you what the concrete foundation looks like once the steel forms are removed. The concrete is now curing and will reach its maximum strength in approximately 28 days. By code, we must wait a minimum of 7 days before
putting dirt against the foundation.
Here you can see the foundation crew shooting gravel into the basement to prep for the basement floor pour. We have all the plumbing prepped and ready to go as well!